Java LocalDate类| lengthOfYear()方法和示例
LocalDate類lengthOfYear()方法 (LocalDate Class lengthOfYear() method)
lengthOfYear() method is available in java.time package.
lengthOfYear()方法在java.time包中可用。
lengthOfYear() method is used to get the length of the year represented by this LocalDate.
lengthOfYear()方法用于獲取此LocalDate表示的年份的長度。
length of year = No. of days in a year [i.e. 1 to 365 (for a non-leap year) or 366 (for leap year)].
年的長度=一年中的天數(shù)[即1到365(對于非-年)或366(對于leap年)]。
lengthOfYear() method is a non-static method, it is accessible with the class object only and if we try to access the method with the class name then we will get an error.
lengthOfYear()方法是一種非靜態(tài)方法,只能通過類對象訪問,如果嘗試使用類名稱訪問該方法,則會收到錯誤消息。
lengthOfYear() method does not throw an exception at the time of returning length.
lengthOfYear()方法在返回length時不會引發(fā)異常。
Syntax:
句法:
public int lengthOfYear();Parameter(s):
參數(shù):
None
沒有
Return value:
返回值:
The return type of this method is int, it returns the length of year denoted by this object.
此方法的返回類型為int ,它返回此對象表示的年長度。
Example:
例:
// Java program to demonstrate the example // of int lengthOfYear() method of LocalDateimport java.time.*;public class LengthOfYearOfLocalDate {public static void main(String args[]) {// Instantiates three LocalDateLocalDate l_da1 = LocalDate.parse("2007-04-04");LocalDate l_da2 = LocalDate.now();LocalDate l_da3 = LocalDate.of(2008, Month.FEBRUARY, 06);// Display l_da1,l_da2 and l_da3System.out.println("LocalDate l_da1,l_da2 and l_da3: ");System.out.println("l_da1: " + l_da1);System.out.println("l_da2: " + l_da2);System.out.println("l_da3: " + l_da3);System.out.println();// Here, this method returns the length// of year represented by this date// l_da1 i.e. here l_da1 = "2007-04-04"// then number of days in the year 2007 is// 365 i.e. length = 365int length = l_da1.lengthOfYear();// Display lengthSystem.out.println("l_da1.lengthOfYear(): " + length);// Here, this method returns the length of// year represented by this date// l_da2 i.e. here l_da2 = "2020-05-08" // then number of days in the year 2020// is 366 i.e. length = 366length = l_da2.lengthOfYear();// Display lengthSystem.out.println("l_da2.lengthOfYear(): " + length);// Here, this method returns the length of// year represented by this date// l_da3 i.e. here l_da3 = "2008-02-06" // then number of days in the year 2008 // is 366 i.e. length = 366length = l_da3.lengthOfYear();// Display lengthSystem.out.println("l_da3.lengthOfYear(): " + length);} }Output
輸出量
LocalDate l_da1,l_da2 and l_da3: l_da1: 2007-04-04 l_da2: 2020-06-02 l_da3: 2008-02-06l_da1.lengthOfYear(): 365 l_da2.lengthOfYear(): 366 l_da3.lengthOfYear(): 366翻譯自: https://www.includehelp.com/java/localdate-lengthofyear-method-with-example.aspx
總結(jié)
以上是生活随笔為你收集整理的Java LocalDate类| lengthOfYear()方法和示例的全部內(nèi)容,希望文章能夠幫你解決所遇到的問題。
- 上一篇: 为什么wait/notify必须要和sy
- 下一篇: 两个矩阵相乘的乘法次数_C ++程序将两