ap drawing 课件_ILITEK TP AP introduction.ppt
ILITEK TP AP introduction
Drawing Direction – module test Button L/R Sensor test AP Condition Condition 選擇 interface I2C USB I2C選項(xiàng) I2C default addr : 0x82 I2C default length : 9 測試時(shí)間限制 F/W Programming F/W Programming 2102/2103 TP Module Programming Set up I2C I/F USB I/F 奕力tool I2C Master 奕力tool Writer TS測點(diǎn) 2102/03 F/W Programming 按writer button 連線 F/W Programming 連線成功 F/W Programming Load HEX file F/W Programming F/W Programming Thank You Very Much Sensor test AP ProFile Create ProFile Create (進(jìn)階版) 選擇一塊 Sensor標(biāo)準(zhǔn)品當(dāng)基準(zhǔn) 勾選 Load BenchMark 勾選 trace loading 勾選 All Node 給定window 值 X/Y Max/Min會自動計(jì)算 ProFile Create (進(jìn)階版) 按 Connection 取消勾選 load benchmark 選擇 Sensor Test item 選擇 Module Test item 其它設(shè)定 information Save ProFile Sensor test AP (進(jìn)階版) Sensor Test Sensor test – start to test (進(jìn)階版) 按 connection button I2C or USB連線 比對 F/W version Profile MCU F/W version Sensor test – Trace loading (進(jìn)階版) FPC 走線的Sensor平整度數(shù)據(jù) X channel Y channel Sensor test – Pass condition (進(jìn)階版) 如果pass, sensor 對應(yīng)圖沒有變化,代表pass 32(X) : 17(Y) Sensor Sensor test–trace loading - window(進(jìn)階版) Window 值為測試容許誤差 Window建議值 10 ex : X1 : 179 179+10 < 容許範(fàn)圍 < 179-10 Sensor test – Trace Loading (進(jìn)階版) Trace loading fail Sensor test – X Trace Fail (進(jìn)階版) X trace loading benchmark X trace read trace loading Sensor test – Y Trace Fail (進(jìn)階版) Y trace loading benchmark Y trace read trace loading Sensor test – All Node (進(jìn)階版) Y Driven (Benchmark) Sensor Matrix 平整度 Sensor test – All Node (進(jìn)階版) X Driven(Benchmark) Sensor Matrix平整度 Sensor test – All Node - window (進(jìn)階版) Window值為測試容許誤差 Window建議值 25 Y driven范圍 : Ex : 183為 benchmark最大值 + window值 92為 benchmark最小值 - window值 X driven范圍 : Sensor test – All Node (進(jìn)階版) Test fail Sensor test – All Node (進(jìn)階版) Open/Short Test Fail ? 整條都255 or 0 Sensor test – All Node (進(jìn)階版) 針對該處OM 觀察 All nodes: Y driven Bridge 破掉情況 Sensor test AP Module Test Module test – single point Module test – single point T
總結(jié)
以上是生活随笔為你收集整理的ap drawing 课件_ILITEK TP AP introduction.ppt的全部內(nèi)容,希望文章能夠幫你解決所遇到的問題。
- 上一篇: 凯立德3d实景地图_360全景地图、3D
- 下一篇: dbinfo.properties my